The Flannery Centre – Skillset, Bathurst

Posted by: on in | Comments Off on The Flannery Centre – Skillset, Bathurst

img_0429-jpgrs_

Hybrid Power Systems Orange has raised the 14m high, 5kW Vertical axis wind turbine at Skillset’s green skills centre, The Flannery Centre in Bathurst. A 50 tonne crane was engaged to perform the lift. This is the final addition to the ‘hybrid’ power system which includes 30kW of photovoltaic solar power. The ‘hybrid’ system is expected to generate, on average, 150kW hours/day for the sustainability centre. Johnathan Davis Senior EngineerRead More

Click on the link belowSED logo 1
  • Follow us on Facebook!